Maintenance - Pool
up:: La Finka - Maintenance
tags:: #SOP
Meta
Meta Notes go here
Pool Maintenance Overview
Goals:
- Chlorine 0.5-1.0 ppm
- No Algae bloom
- Tame algae under plaster
- Swimmable year round
Pool Masters:
- @Ryan, @Kevin?
- ToDo:: Ask Flock who wants to be a Pool Master
- Q:: What is the reward for being pool Pool Master?
Routine Maintenance Schedule
Tracking done on whiteboard in pool shed
- Brush: Entire Pool weekly with metal brush
- Chemicals: Chlorine Check Weekly (Sundays)
- Backwash: 2-4 weeks (Check Pressure Gauge)
- Fill Water: As needed (Maintain level above tile)
Tracking with Whiteboard
ToDo:: Insert Photo of Whiteboard
Columns
- Date:
- Who
- Chlorine Level
- Chems added
- Backwash
Guides
How To - Backwash
ToDo:: Insert Photos aiding backwash procedure
- Make Sure Pump is Off
- Adjust Valve from default - "Filter" to "Backwash"
- Turn on pump
- Watch backwash out side of pool shed and wait until water becomes "clearish" 1-2 min
- Turn off pump
- Adjust valve to "Rinse"
- Turn On Pump
- Wait 30 seconds for sand filter to settle
- Turn off pump
- Adjust valve back to default position "Filter"
How To - Pool Chems
ToDo:: Insert Photos aiding pool chem testing
- Get Test Kit
- Rinse smaller test vial
- Fill with water to line
- Add 5 drops chemical 1
- Compare color to determine chlorine levels - Target 1ppm
Seasonal
Spring - Start Of Season
Summer
- Have fun in the pool
Fall
- 6 months after start Pool RX Add Booster
Winter
- Minimize leaves in the area to reduce pool cleaning


