Fall 2026 side-by-side trial on the north section (between swale 1 and swale 2): two adjacent treatments, each 10–12 ft long and spanning the ~15 ft between the swales, to exhaust rhizomatous weeds over winter, then plant trees + melons + squash in spring. Captured from a voice note 260925 for desk review.

skills::
lead:: @Niko
start:: #y/2026/Fall
estimated completion:: #y/2027/Spring
season::


Project - Overview

A small comparison trial to knock back persistent rhizome growth on a strip of the north section before planting it out. Two adjacent sections get two different occlusion treatments, left in place through winter to spring, then planted.

Purpose

Find a workable, low-input way to clear rhizomatous weeds from a planting strip without tillage or herbicide — and learn which of two methods works better on our ground for future beds.

Objectives

Background Info

The strip sits on the north section between swale 1 and swale 2. It carries persistent rhizomatous weeds that regrow from root fragments, so a single cut/pull won't clear it. Both treatments work by excluding light (occultation) over the dormant/cold season; the plastic side adds solar heating on sunny days. This is a trial — the winning method informs how we prep future beds.


Project - Details

Open Decisions

# Decision Options Status
D-1 Black-plastic type for Section 2 Must be opaque and last a full winter. Resolved 260925 — Tanner already has black plastic for us
D-2 Does the woodchip layer go over the black plastic too? — Resolved 260925: woodchips go over everything, so 6–9 in on both sections

Scope

In: two treatment sections (each 10–12 ft long × ~15 ft, the full gap between swale 1 and swale 2) on the one strip; install this fall; overwinter; spring plant-out of trees + melons + squash.
Out: the rest of the north section, irrigation design, and species selection beyond the three named crops (fold in at plant-out).

Design

Treatment A — Section 1 (first 10–12 ft): cardboard sheet mulch

Treatment B — Section 2 (second 10–12 ft): black plastic occlusion

Both sections stay in place fall → spring to exhaust rhizome growth, then get planted.

Milestones

A - Install (fall 2026)

Knock down the strip; lay both treatments across the two sections; apply woodchips.

B - Overwinter

Leave sealed through winter; check periodically for gaps/wind lift on the plastic.

C - Spring plant-out

Pull the plastic (Section 2), plant trees + melons + squash across the strip, note regrowth by section (the trial result).

Tasks


Project - Resources

Budget

Materials & Tools

Equipment

References / Examples


Documentation and Media

Photos and Videos

Before/after per section — add at install and again at spring plant-out (the trial record).

Documents

Technologies

Questions / Unknowns


Collaboration and Participation

How to Get Involved

Install day is a good work-day task — laying cardboard, spreading woodchips. Contact @Niko.


Created: 260930-21:59